Agenda and minutes

Venue: Lavery Room (Room G05), City Hall

Contact: Barry Flynn  028 9027 0610

Items
No. Item

1.

Apologies

Minutes:

            Apologies were reported on behalf of Alderman Robinson and Councillors Attwood, Cunningham, McCabe and Mullan.

 

1a

Minutes

Minutes:

            The minutes of the meeting of 12th June were taken as read and signed as correct.  It was reported that those minutes had been adopted by the Council at its meeting on 1st July.

 

1b

Declarations of Interest

Minutes:

            In respect of Item 21, viz., ‘Proposed Relocation of Moyard Playground’, Alderman Rodgers declared an interest in that he was a member of the Belfast Education and Library Board.

 

2.

Financial Reporting - Quarter 1 2014/15 pdf icon PDF 87 KB

Additional documents:

Minutes:

            (Mrs. J. Wilson, Business Manager, attended in connection with this item.)

 

            The Committee considered the undernoted report which provided an update on the Department’s financial performance during the first quarter of the financial year for 2014/2015:

 

“1.Relevant Background Information

       

      The Strategic Policy and Resources Committee agreed on 18 June 2010 that:

·         the council would produce financial reporting packs for the Strategic Policy and Resources Committee and each Standing Committee on a quarterly basis

·         the Budget and Transformation Panel would also receive monthly financial updates if there were any significant issues to report.

 

         The reporting pack contains a summary dashboard of the financial indicators and an executive summary explaining the financial performance of the Parks and Leisure department. It also provides a more detailed explanation of each of the relevant indicators covering the year to date and the year end forecast position.

 

         The style and layout reflect much of the discussion and feedback arising from the members’ financial training at the end of September 2010.  As we previously advised the committee, we will continue to develop the style and contents of the reports in liaison with members.

 

         Central finance and our departmental management team have worked together to develop the information within this financial reporting pack.  

 

2.      Key issues

          

         The current performance in quarter one of the Parks and Leisure department shows a -3.2% variance against the year to date budget; i.e. an under spend of £172k.

 

         There are a number of key reasons for the under spend within the department as follows:

 

         Direct Employee expenses are under spent by 3%.   This relates mainly to a number of vacant posts within some units which have been delayed being filled due to ongoing recruitment processes or reviews.  It is likely that this will remain as an under spend for the remainder of the financial year and is reflected in the forecast.

 

         Utility costs are currently under spent by £51k or 6% however it is not expected to remain at this level as problems with the performance of CHP units continue to be an issue in Leisure.

 

         Grants are under spent by 28% or £64K.  As the centralised process for distributing grants is implemented it is hoped that the timing of the payment of grants will improve and any committed but unclaimed grant funds can be identified and redistributed in the second tranche of funding.

 

         Supplies and Services within the department are under spent by 20%.  This expenditure relates to a number of programmes of work that are being developed and also programmes of work with external partners that are underway and are being monitored on a monthly basis.

 

         Resurfacing of paths is £55k under spent, however the work is on schedule to be completed by the end of the year.

 

         Compensation claims are £51k over budget in Parks and Cemetery Services. The timing of compensation claims is largely unpredictable however the department continues to work with Legal Services to improve the reporting of incidents and ensuring these are managed effectively.

 

         Income  ...  view the full minutes text for item 2.

3.

Partner Agreements Delivery Framework 2014/15 pdf icon PDF 84 KB

Additional documents:

Minutes:

            The Committee agreed to defer consideration of the above-mentioned report to enable briefings to be delivered to those parties who so wished to receive them.

 

4.

Green Flag Awards pdf icon PDF 77 KB

Minutes:

            The Committee was reminded that the Green Flag Awards Scheme had been established in 1996 and was administered by Keep Britain Tidy, the British Trust for Conservation Volunteers and the Green Spaces organisation.  The Assistant Director pointed out that twelve parks had received accreditation under the Scheme. She reminded the Committee that, at its meeting on 8th April, 2013, it had agreed to recommend the Knocknagoney Linear Park, the Dunville Park and the Woodvale Park for assessment under the Scheme in 2014.

 

            The Committee was advised that both the Dunville and Woodvale Parks had been awarded Green Flag accreditation, whilst the Knocknagoney Linear Park had failed narrowly to meet the standard. She indicated that the Department would submit the Knocknagoney Linear Peak for re-assessment in 2015, together with the Connswater Community Greenway. 

 

            The Committee noted the information which had been provided.

 

5.

Active Communities - Correspondence from Sport NI pdf icon PDF 79 KB

Additional documents:

Minutes:

The Committee considered the undernoted report:

 

“1     Relevant Background Information

 

1.1    Active Communities (AC) is a Sport Northern Ireland (SNI) programme, delivered from April 2010 to March 2015, through 11 council groups/ consortia including BCC. 

 

1.2    In July 2014, SNI wrote to the Chief Executive (attached) and officers asking BCC to make a formal response by the end of August, regarding our position on their proposal to seek a 30% financial contribution from Councils to AC programme costs from April 2015.  Sport NI has also asked for a contribution of £5.5K towards the development of a Regional Sports Facilities Management Strategy and a district level council report.

 

1.3    As part of the ongoing programme evaluation process, a value for money (VFM) and compliance audit of the BCSDN AC contract was commissioned by the Council in May 2013.  A report was completed by Cavanagh/Kelly Chartered Accountants in July 2013 and high level contract and management issues were considered by the Parks and Leisure Committee in October 2013.  At the same Committee agreed to undertake an options appraisal on the future management and delivery of the AC programme, ahead of the contract renewal date from April 2015.

 

2       Key Issues

 

2.1    From the period April 2010 – March 2014, Sport NI have invested over £1.6m in the AC programme for Belfast and the Council annually contribute up to a maximum of £50,000. 

         This is currently managed in one of 3 ways:

 

-        Sub-contract to Belfast Community Sports Development Network (BCSDN);

-        Sub-contract to Disability Sport NI; and

-        Directly employing coaches through Leisure Services (participation).

 

         The AC programme has proved to be a valuable coaching and community resource, which has led to high levels of participation in the city including under-represented groups, whilst providing opportunities for partnership working. 

 

         Quantifiable benefits include the delivery of 40,419 sessions, 44,500 coaching hours, involving 67,286 participants with 587,148 participations realised. 

 

2.2    There are a number of options to be considered when reviewing the delivery of the AC programme going forward in the context of the Sport NI request including:

 

         Option 1: Do nothing and close the AC programme without 100% SNI funding;

 

         Option 2: Continue ‘as is’ with BCSDN and 30% BCC funding contribution (estimated at £191,987, based on 2013/14 AC programme actual spend £639,958 including £75,104 management fee);

 

         Option 3: Reduce the overall size of AC programme with BCSDN, within affordability limit determined by BCC;

 

         Option 4: Bring the full management and delivery of the AC programme in-house to BCC in partnership with sports governing bodies and Disability Sport NI.

 

         A full analysis of the risks and benefits of each option will now be undertaken, to bring to Committee for its consideration, once the final Sport NI position is agreed. 

 

2.3    Issue to note in response to SNI consultation

 

         Sport NI is seeking the Council’s commitment to exploring a 30% contribution to AC costs, as they consider options for the refresh of the programme.  In response to SNI, there are a number of key  ...  view the full minutes text for item 5.

6.

Burial Lands at Dundrod - Update

Minutes:

The Committee considered the undernoted report:

 

“1     Relevant Background Information

 

         Members will be aware that as part of the approach to cemetery and crematorium development we have been engaged in a process to identify a site for development as a new cemetery and that discussions have been ongoing around a potential site at Dundrod. 

 

         The site at Dundrod came to the Council through an expression of interest exercise which the Council initiated.  This site was put forward by an agent acting on behalf of a business man who holds an option on the site.  Officers from the Parks and Leisure Department, Legal Services and the Estates Management Unit have held a number of meetings with the party who holds an option on the site along with their agent.  The Council is aware of who the landowners are but at this point have had no direct dealings with them. 

 

         A company, Carston Undertakings Ltd, has now been established and has taken over the option on the site.  Carston Undertakings has commissioned a number of pieces of work around the development of the site and a delegation led by Strategic Planning made a presentation, on their behalf, to the Committee in June, outlining their proposals for the development of a cemetery on the site. 

 

2       Key Issues

 

         Members will be aware that in selecting a site for development as a potential cemetery there are several issues that needs to be considered.  These include:

 

·         Hydro-geological conditions – there are strict guidelines around the soil type and depth that are required and the potential impact on water sources in the area.  NIEA specify the tests that are required to be carried out in relation to this and for the majority of cemetery developments they require Tier 3 tests to be undertaken which are expensive and take approximately 18 months to complete.

 

·         Access and traffic – the Council need to ensure that any cemetery we develop is accessible 365 days a year and that satisfactory access arrangements are provided in accordance with relevant policies i.e. that accesses will not prejudice road safety or significantly inconvenience the flow of traffic.

 

·         Planning assessment – consideration needs to be given to the ease of obtaining planning permission and any issues that might impact on this such as archaeology, ecology and the fit of the development within the proposed location.

 

·         Affordability – given the strict guidelines around cemetery development it is unlikely that a site will be found that does not require significant capital works to bring it to a standard that meets all the guidelines.  The costs including the land acquisitions costs and the costs of any development works will have to be balanced against the percentage of the site which can be developed for burials and the number of burial plots that can be provided within the site.  

 

         Given the constraints around the development of a cemetery site and the potential costs the Council has commissioned a number of initial studies of the site at Dundrod  ...  view the full minutes text for item 6.

7.

Playground Improvement Programme 2014 - 2015 pdf icon PDF 72 KB

Additional documents:

Minutes:

The Committee considered the undernoted report:

 

“1        Relevant Background Information

 

            The 2013/2014 improvement works were complete by the end of March 2014 resulting in the following playgrounds being transformed;

 

·         Sir Thomas and Lady Dixon Park

·         New Lodge

·         Clara Street

·         Dover Street

·         Taughmonagh

·         Michelle Baird Memorial

 

            A total investment of £740k improved accessibility and play value at each of the sites, providing new inclusive equipment, safety surfacing, boundary fencing, site furniture and landscaping works.

 

            Members are also reminded that in June 2013 Committee agreed to a one year refurbishment programme at the following playground sites during this financial year:

 

·         Stewart Street

·         Queen Mary’s Gardens

·         Carnamore

·         Lemberg Street

·         Falls Park

·         Cherryvale Playing Fields.

 

            These sites were prioritised using independent inspections carried out by ‘Play Services Ireland’ in April 2013. A quality score for all 78 playgrounds was based on European safety standards BS EN 1176 & 1177. Inspection reports also continue to identify and prioritise repairs to existing equipment for ongoing maintenance purposes.

 

            As in previous years Community Park Managers and Parks Outreach Managers will continue to assist with the distribution of information relating to playground improvements to members and local communities in the coming year.

 

            Members should also note that this year’s cycle of independent inspections have been completed in May 2014. Priority sites for the 2015 -2016 programme will be identified based on quality scoring and recommendations reported to Committee in the coming months.

 

2          Key Issues

            For the 2014/15 programme the investment of £745k will be jointly funded from the playground budget and the Council’s capital budget.

 

 

            Information regarding additional LGR sites

            Local Government Reform will see additional playgrounds transferred from Castlereagh and Lisburn in 2015. These will be inspected by our independent playground inspector and scored in accordance with our standard procedure along with the current list of playgrounds. Refurbishments will be based on scores arising from the independent inspection report. The playgrounds to be transferred are as follows:-

 

            Lisburn playgrounds:

 

·         White Rise, Lagmore

·         Twinbrook 

·         Fullerton Park

·         Areema

·         Edenderry

·         Jubilee Park

·         Mount Eagles Park

·         Sally Gardens

 

            Castlereagh playgrounds 

 

·         Cregagh play area

·         Roddens Crescent

·         Clonduff Drive

·         Carema Allen

·         Belvoir Drive

·         Tullycarnet Resource centre

·         Tullycarnet Park

 

            In addition there are a number of playgrounds attached to Community Services which are currently managed by the Development Department.  It is proposed that these are also transferred to be included in the Parks and Leisure Playground Improvement Programme.  If agreed a further report will be brought to Committee outlining the resource implications of this for the overall programme.

 

3          Resource Implications

 

            Financial

            All refurbishment work will be funded through the Playground Refurbishment revenue budget 2014 -15 and from the Council’s capital budget.  The total investment will be £745k.

  


 

4          Recommendations

 

            Members are asked to note the playground sites to be refurbished this financial year and note that a further report will be brought to Committee setting out the refurbishment programme for the next three years.

 

            Members are also asked to agree in principle to the transfer of Community Service playgrounds into the programme  ...  view the full minutes text for item 7.

8.

Boxing Sculptures - Update pdf icon PDF 63 KB

Minutes:

            The Committee noted the contents of a report which provided an update on the capital-funded scheme which would oversee the erection of three boxing sculptures within the undernoted sites:

 

·         The Cathedral Gardens – statue of Rinty Monaghan;

·         The Dunville Park – statue of John Caldwell; and

·         The Woodvale Park – statue dedicated to the boxers of the Shankill area.

 

            The Committee agreed that the Council would manage and maintain the statues once they had been installed.

9.

Drumglass Park - Charity Live Musical Event pdf icon PDF 75 KB

Additional documents:

Minutes:

            The Committee was informed that a request had been received from Bachus Inns Ltd. seeking permission to host three open-air events in the Drumglass Park in September 2014. The Assistant Director reported that the events were to be held in conjunction with the Down’s Syndrome Association. She informed the Committee that, since the report had been issued, a further request had been made by the applicant to change the dates for the event to June, 2015. 

 

            Following discussion, the Committee agreed to defer consideration of the request to allow additional information to be provided on the Down’s Syndrome Association’s involvement in the proposed event and on any proposed consultation which would be undertaken with residents living adjacent to the park.

 

10.

Proposal to Develop the Blanchflower Playing Fields pdf icon PDF 67 KB

Minutes:

            The Committee considered the undernoted report:

 

“1.    Background Information

          

         The purpose of this report is to inform the Committee of an emerging proposal from Harland and Wolff Welders Football club which would seek to develop Blanchflower Playing Fields into a modern playing field facility with Harland and Wolff Welders at its centre. 

 

         Harland and Wolff are seeking a lease from the Council in relation to the playing fields at Blanchflower.  The Club has preliminary proposals which would, if realised, deliver:

 

1.    A new home stadium for Harland and Wolff Football Club which would be IFA Premiership Standard;

2.    Clubhouse facilities including changing rooms, medical room, gymnasium and media room;

3.    The Clubhouse would also include a Boardroom and function room with kitchen facilities for the preparation of food;

4.    4 additional 3G artificial turf pitches with ancillary structures including floodlighting, additional changing, and car parking.

 

         The project is at an early stage in its development and lacks detail at this time. The club has however established a Steering Group to manage the project.  The Club wishes to engage with the Council both as the landowner and also a potential funder of the project. 

 

         The Club has initiated a series of discussions with sports clubs and organisations from with the Greater East Belfast area and has indicated that there is interest from these groups to use such a facility should one be developed.

 

         The Club acknowledges that this is a significant project to undertake and recognises that it will require significant levels of funding from a variety of sources.  The Club also acknowledges that the development may need to be undertaken in a phased manner to reflect the availability of resources.  

 

         The Club is seeking the Council’s support to move this project forward and has requested that an Official representative from the Council join the Steering Group in an advisory capacity. 

 

2.      Key Issues

          

         The Committee is asked to consider the following points:

 

1.    Harland and Wolff Welders is a well established Football Club and also manages a successful Social Club;

2.    The proposal in relation to Blanchflower Playing Fields is in its early stages and will require significant planning and funding to be fully realised;

3.    The Club recognises that the proposal goes beyond its own aspirations and needs and seeks to provide much needed modern facilities in East Belfast;

4.    Through discussions with representatives from the Club and elected Representatives from the area,  Officers are satisfied that the Club is aware of the ambitious nature of the project and is seeking to move forward in a structured and professional manner;

5.    A business plan to demonstrate the feasibility, deliverability and sustainability of the proposal has not yet been produced but will be undertaken by the Club;

6.    The Club wishes to engage with the Council throughout the process and involve the council in the development of the project.

 

3.      Resource Implications

          

         Financial Implications

         The financial implications are unknown at this time.   

 

4.      Recommendations

         The Committee is asked to  ...  view the full minutes text for item 10.

11.

Winter Warmer Events pdf icon PDF 64 KB

Minutes:

            The Committee agreed to grant the free use of the Andersonstown and Ballysillan Leisure Centres, together with the Indoor Tennis Centre at the Ormeau Park, for the hosting of four ‘Winter Warmer Events’ during October and November. It was noted that the events were being co-ordinated by the Council’s Healthy Ageing Co-ordination Group in conjunction with the Leisure Participation Unit.

12.

Northern Ireland Street League - Funding pdf icon PDF 70 KB

Minutes:

            The Committee considered the undernoted report:

 

“1     Relevant Background Information

 

         NI Street League is a charity working with homeless people and marginalised groups in Northern Ireland through the medium of football. Their activities are principally focused in Belfast and their aim is to use football to reach some of the most marginalized people in our society.  Using football as a hook they then provide education, training, and volunteer opportunities.

 

         In October 2014 the charity is bringing the NI Homeless Football Team to the Homeless World Cup in Santiago Chile and 10 teams from Belfast are attending. In order to do so they have acquired a cocktail of support from several organizations and via fundraising from for example IFA, NIHE, Extern and comic relief. 

 

         The Parks and Leisure department has been approached to help with the overall funding for this event and the shortfall of £4400.

 

         Advice from the Legal Services Manager has indicated that as a general rule district councils do not have any legal power to contribute to the funds of charitable organisations. The only exception to that general rule being where an application for financial assistance is made under criteria which the Council has in place in relation to the incurring of expenditure for special purposes under the provisions of the Local Government Finance Act (NI) 2011 section 37 (previously known as section 115 of the Local Government Act (NI) 1972.)

 

         The Act permits the council to make any payment for any purpose which in its opinion is in the interests of, and will bring direct benefit to:

a)    the council;

b)    the district or any part of its district; or

c)    the inhabitants of its district of any part of its district.

 

         The amount of money available under Section 37 is subject to an annual cap and in determining whether any payment should be made the Council must ask whether the benefit would be commensurate with the payment to be made.

 

         Key Issues

 

·         The NI Street League has made a request to the Council for a financial contribution to the Homeless World Cup event

·         The project is principally focused on reaching excluded communities in Belfast; changing peoples’ lives, creating role models, and using sport to improve the quality of life in the city. The benefits include: breaking out of homelessness and maintaining independence, reducing crime, physical and mental health improvement, accessing training/education/employment/volunteering, increased self-confidence and self-esteem, tackling sectarianism and racism, developing role models and sustainable communities. These outcomes have been evidenced via two evaluations (2012, 2014), which are available on request, and in feedback from stakeholders.

·         Should the Committee be minded to make a contribution to the trust, given its charitable status, the contribution would have to be made under Section 37 Local Government Finance Act (NI) 2011.

·         An assessment of the request against the criteria agreed by the Policy and Resources Committee in 2004 has indicated that the request would bring a direct benefit to the inhabitants of Belfast.

·         It is proposed that the Committee seek  ...  view the full minutes text for item 12.

13.

Ozone Indoor Tennis Arena - Upgrade pdf icon PDF 88 KB

Minutes:

            The Committee considered the undernoted report:

 

“1        Background Information

       

            The purpose of this report is to advise Members of the timetable and implications of the work scheduled to upgrade the flooring and lighting provision of The Ozone Indoor Tennis Centre. Additional upgrade works have been scheduled for the lighting within the laser quest facility and some minor refurbishments have been planned for the reception area. The planned upgrade to the tennis flooring surface will result in the arena attaining a two star standard under the International Tennis Association (ITA) grading system.

 

2          Key Issues

       

            The planned works are scheduled to commence on Monday 13th October 2013 with a completion date of Friday 16th January 2015. The budget allocation is as follows -

 

Tennis surface upgrading - £70,000

Tennis hall lighting upgrade - £75,000

Laser Quest lighting upgrade - £25,000

Laser Quest exterior wall repairing – financed within existing budgets

 

Reception area painted and some floor resurfacing – financed within existing budgets.

 

            It will be possible to maintain a reduced level of customer provision within the facility during the upgrade period however the tennis courts and climbing wall will have to close at this time. The climbing wall forms part of the extended tennis hall and the flooring surface of this area will also be renewed as part of the project. Furthermore, the health and safety considerations pertaining to general customer access, dust, noise and glue based adhesive have resulted in a recommendation to close the climbing wall for the duration of the upgrade.

 

            The Laser Quest facility, whilst, being upgraded with a new lighting system, will only be subject to minimum duration closures which will be mutually agreed between local management and property and projects colleagues. The works connected with the lighting upgrade are expected to be primarily undertaken during scheduled down time within the Laser Quest facility.  

 

            The Reception area will be painted and some flooring replaced. A closure of this area is not required. Similarly, the fitness suite and changing areas will operate as normal.

 

3          Resource Implications

           

            Financial

 

            Income during the equivalent period (13th Oct 2013 – 16th January 2014) was recorded as being:

 

            Climbing - £15,246

            Tennis courses - £13,174

            Tennis casual - £25,302

 

            In addition, it is envisaged that approximately 200 Boost members may avail of the option to freeze their memberships during this time. Based upon the present charges of £26 or £13 per month an estimation of a further £11 310 of lost income would need to be noted.

 

            Total projected lost income of £51,858.  It should also be noted that the newly improved lighting system within the tennis hall is expected to generate approximately £10,000 of efficiency savings on an ongoing annual basis.

 

            Human Resources

 

            All affected staff to be briefed accordingly. Due to the reduced service provision some staff will be afforded the option of taking annual leave or temporarily transferring to other council leisure facilities.”

 

            The Committee noted the information which had been provided and agreed to the partial closure  ...  view the full minutes text for item 13.

14.

Playgroup Building at Ormeau Park pdf icon PDF 115 KB

Additional documents:

Minutes:

            The Committee agreed to recommend to the Strategic Policy and Resources Committee that it renew, with effect from 1st July, 2014, the lease between the Council and the tenant at the above-mentioned property for a further 5-year period with the rent to be set at £3,880 per annum.

 

15.

Grampian Avenue Play Area - Licence Renewal pdf icon PDF 114 KB

Additional documents:

Minutes:

            The Committee was reminded that the former Client Services (Parks and Amenities) Sub-Committee had, in January 2000, agreed to acquire a portion of land at Grampian Avenue for the development of a park and associated play facilities. The Director reminded the Committee that the Council had entered into an initial four-year licence agreement with the Department for Regional Development and Helm Housing Association for the land, which had lapsed in April, 2006. Thereafter, the Council had renewed that licence on a month-to-month basis. The Director reported that, after re-evaluation, it had been deemed appropriate to seek to extend the terms of that licence over a longer-term period. 

 

            The Committee agreed to extend the licences with both the Department for Regional Development and Helm Housing for the land at Grampian Avenue for a period of 5 years, subject to the approval of the Strategic Policy and Resources Committee.

 

16.

Beechvale Farm - Leasing to the Agri-Food and Biosciences Institute pdf icon PDF 112 KB

Additional documents:

Minutes:

            The Committee agreed to recommend to the Strategic Policy and Resources Committee that it renew the current lease between the Council and the Agri-food and Biosciences Institute for a further 5-year term from 1st December, 2014, with the rent to be set at £8,000 per annum.

 

17.

Licence Agreement - 155-157 Newtownards Road pdf icon PDF 116 KB

Additional documents:

Minutes:

            The Committee agreed to recommend to the Strategic Policy and Resources Committee that it would enter into a licence agreement with the Department for Social Development (DSD) until the period ending 31st March, 2015, to enable the Council to develop a ‘pocket park’ on a vacant site at the above-mentioned location as part of the Renewing the Routes Programme.

 

            The Committee noted also that the site would transfer from the DSD to the Council in April, 2015, and agreed that, during the interim period, the Council would manage and maintain the park subject to funding being obtained from the DSD.

 

18.

Pitches Strategy - Musgrave Park Proposals pdf icon PDF 66 KB

Minutes:

The Committee considered the undernoted report:

 

“1.      Background Information

       

            The Committee is reminded that as part of its Pitches Strategy it was agreed that Musgrave Park would receive investment to provide a 4 room changing pavilion.  In addition, the Committee has been previously authorised:

 

1.    The inclusion of a reception room within the changing pavilion, on condition that it receives planning approval and the cost is met by St Brigid’s GAC or other external funding source; and

2.    The extension of the existing training pitch up to full championship size, on condition that planning approval is received and the funding is secured external to the Council;

 

            In the course of ongoing discussions with St Brigid’s GAC the Club has indicated a willingness to invest to enhance the facility through (a) the erection of security fencing which would be intended to minimise unauthorised use of the pitch; and (b) to install floodlighting which would facilitate flexible use of the pitch during the winter months to support the playing of end of season championship games and training and (c) to provide a path around the pitch area.

 

2.         Key Issues

       

            The Committee is asked to note the following:

 

1.    Planning permission has been received, albeit with lighting restrictions, for the agreed works and also the proposed additional works as outlined in this report; although the approval is conditional on the floodlighting not being used between April and October each year;

2.    St Brigid’s currently has a Facilities Management Agreement which has just short of 13 years remaining;

3.    The investment represents a desire by the Club to enhance the facility;

4.    The Club has indicated that it is prepared to make the investment subject to acceptable costs being provided;  

5.    The works will be undertaken as part of the contract for the construction of the changing pavilion and will be delivered to an acceptable standard;

6.    Whilst the facility is subject to a Facilities Management Agreement the asset remains under the ownership of BCC; therefore should the Council agree to permit the investment to go ahead, the Council will assume maintenance responsibilities for the fencing, path and floodlighting.

 

3.         Resource Implications

       

            Financial Implications

 

            The capital cost of the works will be met by St Brigid’s GAC, however, the annual revenue costs plus future replacement costs will incur expenditure by the Council. 

 

            Human Resource Implications

 

            There are no additional human resource implications

 

            Asset and Other Implications

 

            As indicated in the ‘Background’ the erection of the fencing will help to minimise unauthorised use of the pitch; the path will facilitate movement around the pitches.  The floodlighting will help pre season training and facilitate end of season games.  However, it will be important to ensure that the pitches receive adequate recovery time during the closed season to reflect the high level of use of this facility.  It is therefore anticipated that the use of the pitches over the winter months will be minimal.

  

5.         Recommendations

       

            The Committee is asked to agree to the provision of  ...  view the full minutes text for item 18.

19.

Ormeau Park - Amendment to Pitches Strategy Proposal pdf icon PDF 63 KB

Minutes:

            The Committee considered the undernoted report:

 

“1.    Relevant Background Information

 

         The purpose of this report is to reconsider the proposal from the Pitches Strategy relating to Ormeau Park within the context of the emerging Leisure Transformation Programme.

 

         Members are reminded that within the Pitches Strategy it was agreed that the Council would provide a 3rd generation artificial turf pitch with fencing and floodlighting and a changing pavilion at Ormeau Park. 

 

         In line with that decision a planning application has been lodged with the Planning service and this is currently receiving consideration.  At a recent meeting with the Planning Service concern was expressed about the location of the proposed pitch and the pavilion. 

 

         Following discussion the location of the pitch was accepted on technical grounds, however concern remained over the location of the pavilion.  Planning Service indicated that it would prefer the new pavilion to be located immediately adjacent to the Ozone Building. 

 

         Members will be aware that the Leisure Transformation Programme has been developed and adopted, post the Pitches Strategy.  Under Leisure Transformation it is intended that the management of our Leisure assets transfer to a Trust Model.  

 

         As work on Leisure Transformation continues on the development of a specification, it is proposed that the development of a new pavilion be delayed and that Officers explore the extent of the works and associated costs of refurbishing part of the Ozone to accommodate the addition of the 3G pitch. 

          

         It is intended that work on the construction of the 3G pitch be continued with a view to completion in 2015.

 

2.      Key Issues

        

         The key issue for the Committee at this time is that there is likely to be a time delay in the construction of the 3G pitch and the delivery of the changing facilities. 

   

3.      Recommendations

 

         The Committee is asked to agree that the construction of a stand-alone changing pavilion at Ormeau Park be deferred at this time and that the construction of the 3G pitch be progressed.”

 

            The Committee adopted the recommendations.

 

20.

Marrowbone Millenium Park - Playing Pitch pdf icon PDF 117 KB

Minutes:

            The Committee considered the undernoted report:

 

 “1       Relevant Background Information

       

            The Committee will be aware that the Marrowbone Millennium Park has recently benefited from the construction of a 3G artificial turf pitch.  Members will recall that as part of the terms and conditions of the funding from Sports NI the Council is required to provide the management model for the new pitch with a view to transferring it to the community. 

 

            To facilitate this process, as previously reported, Council Officers are working with representatives from the Ardoyne Youth Providers Forum (AYPF) to develop a programme of use for the facility and to support the building of capacity within the community to enable it to manage the facility in the future.  Emerging from ongoing discussions with the Group a number of issues have emerged which require Committee approval, the purpose of this report is to present these issues to Committee for decision. 

 

2          Key Issues

 

            There are a number of issues to be considered by Committee as detailed below:

 

            Ball stop netting and anti climb sheeting

 

            Post completion of the capital works AYPF has requested the following:

 

a)    An additional ball stop netting to the high level fence to be erected to further minimise the potential for balls to escape out of the facility; the estimated cost of this is in the region of £ 17,000.

b)    Metal sheeting to be erected over the entrance gates which are currently being used to climb into the facility for unauthorised use. The estimated cost of this is in the region of £1,700.

 

            The costs will be accommodated within the existing maintenance budgets.

 

            Provision of Dug outs

 

            The group has requested the Council’s permission to install dug outs on adjacent to the 3G pitch for use during matches.  The cost of this will be met through the Ardoyne Youth Providers Forum – Sports Sub Group. 

 

            It is proposed that permission be granted providing the dugout is in good condition and properly installed and maintained by the group. 

 

            Use of active communities' coaches

 

            The Committee is reminded that there is provision for free use of a facility, providing it does not result in displacement, where the activity is part of the active communities programme.  This provision currently relates to Leisure Centre facilities. 

 

            It is proposed that this be extended to include the 3G facility at Marrowbone, work is on going to develop an active communities programme for the facility. 

 

            Proposed launch event

 

            The facility has been operational since April 2014 with an official photo shoot and press release at that time.  However the Forum has asked for permission to hold a day long opening event at the Park itself. This would provide for a range of family based activities through the Millennium Park including use of the 3G pitch. The intention is that this would be held on 7th September 2014. 

 

            The cost of the event is estimated to be in the region of £5,000 and the Forum has asked if the Council would agree  ...  view the full minutes text for item 20.

21.

Proposed Relocation of Moyard Playground pdf icon PDF 69 KB

Additional documents:

Minutes:

            The Committee considered the undernoted report:

 

“1.       Relevant Background Information

       

            Members may be aware that the Council provides a standalone playground and small kick about area within the Moyard Estate on land leased from the Northern Ireland Housing Executive (NIHE). 

 

            The existing location is isolated from the main body of the estate and has been used as a gathering point for local youths who engage in anti social behaviour and at times the facility has been subjected to vandalism with equipment being damaged and fires set. 

 

            The location is not ideal for a playground, however, this is an area lacking in accessible open space and options are limited. 

 

            Council Officers have recently been approached by local community workers and elected representatives from the area with a view to relocating the existing playground. The proposed location is on a former school site.  The school has been demolished and is now a vacant site with potential for development.

 

            The Belfast Education and Library Board (BELB) has indicated a willingness to invest in the development of a mini pitch which would be aligned to and managed through the adjacent Matt Talbot (Vere Foster) Youth Club.  In addition, the Board has indicated a willingness to lease part of the land to the Council with a view to the potential relocation of the playground and casual multi user games area. 

 

            Council Officers would agree that the new proposed location would provide improved access.  The proximity to the residential housing and to the Youth Club provides improved opportunities to encourage greater use of the asset. 

 

2.         Key Issues

       

            There are a number of issues for members to consider:

 

1.    The existing playground location is isolated and subject to regular anti social behaviour; it has been recently inspected and there is evidence of damage to the wet pour throughout the playground, swings have been removed and the mesh fencing has been badly damaged.

2.    The playground is not included in the current financial years’ refurbishment programme; however, the current condition would anticipate its inclusion in 15/16 with an estimated budget of £150,000.

3.    The proposed new site presents a more favourable location for such a facility and is likely to attract greater use;

4.    At this point in time the cost of providing a replacement facility is not known, no detail has been worked up, and would be subject to further consultation and site investigation;

5.    Should the Council wish to progress this option the project would need to be included on and funded through the Capital Programme and would be subject to capital Programme Process applied within Council;

6.    The existing playground is located on a site which is currently leased from the NIHE and it would be intended that this lease be surrendered, the NIHE has indicated that it would look sympathetically at a request to surrender of the lease.

 

3.         Resource Implications

       

            Financial Implications

 

            The financial implications are unclear at this time, at this time the only source of funding would b e  ...  view the full minutes text for item 21.

22.

Falls Park Gate Lodge pdf icon PDF 79 KB

Minutes:

            The Committee considered the undernoted report:

 

“1.       Relevant Background Information

 

            Members may recall that the Gate Lodge, which is located at the main entrance to the Park at 512 Falls Road, is included within the Falls Park Masterplan and is included on the Capital Programme as an emerging project.

 

            A short piece of work was commissioned to establish options with which to inform a decision on how best to move forward.  This report sets out the current position.

 

            The Gate Lodge was built in 1879, although it is not currently listed.  It has a total floor area of 115 square metres over two floors; this includes an extension which post dated the original construction.  It was originally configured as a ranger’s lodge and consisted of a lounge, living room, kitchen and bathroom on the ground floor and three bedrooms on the first floor.  The lodge was damaged by fire in 2000 and has remained unused since that time.  The building was secured and galvanised metal sheeting was placed over the roof to protect its structural stability.  As a result the building remains intact and is structurally sound, subject to a more extensive survey. 

 

            Following a quotation exercise, a consultant was appointed to undertake an options appraisal which would:

 

·                 Review the condition of the building;

·                 Identify potential future uses of the building; and

·                 Establish potential options

 

            Condition of the property

 

            A condition survey of the property was completed which concluded that the structural integrity of the building remained intact and could be refurbished.   These findings were mainly based on observation and it may be necessary for a more detailed survey to be undertaken at a future date.

 

            Preliminary Consultation

 

            To establish potential uses of the Gate lodge some preliminary consultation was carried out at a local level.  In general the main points emerging were:

 

1.    The Gate Lodge should be refurbished and brought back into use;

2.    The future use should complement the park and be accessible to the community;

3.    The primary function should be to promote the park and be a focal point of reference for information about the park including planned events and activities;

4.    The Gate Lodge should be refurbished as a flexible building to enable it to be responsive to seasonal and community variations in demand;

 

            In addition to the general points above, a number of more specific suggestions were put forward:

 

a)    The provision of a café area;

b)    A genealogical resource within the building;

c)    Additional car parking;

d)    The provision of a soft play area for toddlers;

e)    Office accommodation for local groups working within Falls Park such as the Friends of Falls Park or Feile an Phobail;

 

            Given the location of the Gate Lodge there was a strong sense that the Council should bring the building back into use and to promote its use and that of the park not only for the local community but also for visitors to the city and residents from all parts of the city.  Within this  ...  view the full minutes text for item 22.

23.

Proposal to Acquire Land and Upgrade Facilities at Navarra Place - White City pdf icon PDF 69 KB

Minutes:

            The Committee considered the undernoted report:

 

“1.       Relevant Background Information

 

            The purpose of this report is to update the Committee on a proposal emerging through the North Belfast Area Working Group relating to facilities at Navarra Place in White City. 

 

            This is a small area off the Whitewell Road which runs adjacent to the Serpentine Road at a community interface.  The land is currently owned by the Northern Ireland Housing Executive (NIHE). White City has a community centre and a small play area which, while in good condition is limited, and is mainly designed for young children. The playground was put in place by the Council in partnership with the NIHE who provided the monies for the project. 

 

            At the North Area Working Group it was proposed that consideration be given to how the facility could be upgraded.  A series of meetings have been held with some residents from the area, local elected representatives and the NIHE.  Emerging from the discussions was a proposal that:

 

1.    The Council acquire the land from NIHE;

2.    The Council facilitate a discussion with local residents to consider options to upgrade the facility to include a junior and senior playground and possibly a small kick about area (MUGA);

3.    The Council consider placing this proposal as an emerging project under its Capital Programme.

 

2.         Key Issues

 

            Members will recall that they noted in February that the SP&R Committee had agreed to progress a MUGA Programme under its Capital Programme.  It was highlighted that a series of condition surveys to inform a rolling programme of refurbishments would be undertaken which are currently underway and that an update on the MUGA Programme, including a proposed rolling programme for refurbishments, will be brought back to Committee later in the year.

 

            However in the interim there is now an opportunity to acquire the site at Navarra Place which could be suitable for the development of a MUGA.  Members are asked to note that this proposal was considered by the SP&R Committee at its meeting on 22nd June where approval was given to officers to proceed with the acquisition of land at Navarra Place from the NIHE and to consider this proposal under the emerging MUGA Programme.   

 

            The Committee is asked to note the following points:

 

1.    The existing playground is limited and there is scope to enhance the facility;

2.    There is no evidence of vandalism or anti social behaviour around the existing playground and it remains a respected asset by the residents;

3.    NIHE has indicated a willingness to transfer the land to the Council for the purpose of providing a play area;

4.    The cost is not yet known as no design work has been undertaken and this will be taken forward by Parks & Leisure and Property & Projects staff;

5.    Preliminary site investigations are currently ongoing to determine any issues with the land that would present a risk to the Council should it wish to proceed with development – such as the presence of  ...  view the full minutes text for item 23.

24.

Enhancement Work to City Cemetery Walls pdf icon PDF 63 KB

Additional documents:

Minutes:

            The Committee was advised that the Department of Social Development had made £273,000 available for the undertaking of enhancement work to the walls of the City Cemetery. The Committee was apprised of the extent of the work, which would entail the installation of lighting and preservation work to the walls. The Director advised the Committee that once completed the Council would maintain the lighting scheme and pay the associated electricity costs, which were estimated to be in the region of £1,000 per annum.

 

            The Committee granted approval for the work to be undertaken at the City Cemetery.